Cevahir Sky City Skopje
Installation and regular maintenance of high-capacity passenger lifts in the Cevahir Sky City residential and commercial complex, located in Skopje, Macedonia.
Lift Models:
1. Passenger Elevators:
- 4 high-speed MKDA1 and MKDA2 passenger elevators per tower
- 2 elevators with a speed of 4.0 m/s (MKDA2 model)
- 2 elevators with a speed of 3.5 m/s (MKDA1 model)
- Capacity:
- MKDA1: 13–15 passengers (approximately 1,000–1,200 kg)
- MKDA2: 16–20 passengers (approximately 1,300–1,600 kg)
- Serving up to 40 floors in each tower
2. Freight Elevator:
- 1 MKDA2 freight elevator per tower
- Speed: 3.5 m/s
- Capacity: 1,200 kg
- Used for goods transport, moving services, and emergency operations
Features:
- Manufacturer: Specialized in MKDA1 and MKDA2 models.
- System: Electric lifts with hydraulic drive.
- Safety: Emergency braking systems, alarm buttons, and backup power supplies.
- Control: Modern controls with digital displays and user-friendly interfaces.
Activities:
- Installation: Planning and execution of MKDA1 and MKDA2 lift installations in Cevahir Sky City Skopje
- Maintenance: Ongoing monthly inspections and testing in compliance with international elevator safety standards.
- Repairs: Fast intervention service for defect resolution and parts replacement.
- Training: Training on safe usage and basic maintenance for building management teams.
Innovation Initiatives:
- Smart Monitoring System: Installation of IoT-based sensors to enable real-time monitoring of lift performance, allowing for predictive maintenance and early detection of potential issues.
- AI Traffic Optimization: Deployment of artificial intelligence algorithms to optimize lift movement patterns based on passenger flow, reducing waiting times and improving operational efficiency.
- Interactive Digital Displays: Elevator cabins equipped with digital displays showing building notices, advertisements, and information.
- Sustainability Certification: Incorporation of eco-friendly technologies to align with green building standards and pursue certifications such as LEED.
Duration of Cooperation:
- Installation phase completed in 2017
- Maintenance services actively ongoing to the present day, ensuring optimal performance and safety.
Locations:
Cevahir Sky City Skopje
Bulevar Srbija 31A, Skopje, Macedonia
- Tower A: Residential
- Tower B: Residential
- Tower C: Residential
- Tower D: Residential & Commercial




